DocumentCode
2642300
Title
Battery reserve sizing for fibre-in-the-loop equipment based on AC outage data
Author
Hawkins, Barry ; MacKinnon, Peter ; Muirhead, Lan ; Robbins, Tim
Author_Institution
Telstra Res. Lab., Clayton, SA, Australia
fYear
1994
fDate
30 Oct-3 Nov 1994
Firstpage
101
Lastpage
107
Abstract
Telstra Corporation is currently deploying fibre-in-the-loop (FITL) facilities in Australia for pay-TV, and the potential future requirements of video-on-demand and multimedia services. FITL equipment located at the curb or customer´s premises is expected to be powered from a local AC line connection, and hence it will be subject to AC outages. This paper discusses the use of typical metropolitan outage data recorded by Australian electricity supply utilities to assist in the optimum design of curb located FITL equipment. A FITL powering availability model is used to determine the power outage contribution to unavailability for a given battery reserve time
Keywords
distribution networks; electrical faults; electricity supply industry; interactive television; multimedia communication; optical fibre subscriber loops; power system reliability; secondary cells; telecommunication power supplies; uninterruptible power supplies; AC line connection; AC outage data; Australia; FITL; UPS; battery reserve sizing; electricity supply utilities; fibre-in-the-loop equipment; metropolitan outage data; multimedia services; pay-TV; power supply; powering availability model; video-on-demand; Australia; Availability; Batteries; Circuit faults; Data analysis; Databases; Laboratories; Optical fiber devices; Power system modeling; Power system reliability;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1994. INTELEC '94., 16th International
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-2034-4
Type
conf
DOI
10.1109/INTLEC.1994.396604
Filename
396604
Link To Document