DocumentCode :
2642364
Title :
The central office power plant of the future
Author :
Kopniwsky, H.
Author_Institution :
Ericsson Components AB, Stockholm
fYear :
1994
fDate :
30 Oct-3 Nov 1994
Firstpage :
517
Lastpage :
522
Abstract :
The author describes an integrated system approach which would create a comprehensive power system that would have the flexibility to serve the power needs of the future central office, with systems to support multimedia and various operational support systems. All requirements for surge immunity, even higher than normal, could be met in a manner where a complete pre-engineered, pre-packaged, pre-constructed system would exist. This would remove the traditional E, F and I tasks from the process thus contributing to predictability, easy of installation, ease of expansion, higher reliability and lower service costs, less debate about how to construct each local site, better customer relations, and a higher quality system that would be verified before leaving the factory
Keywords :
power system protection; surge protection; telecommunication power supplies; central office power plant; multimedia; operational support systems; power system; reliability; service costs reduction; surge immunity; Cables; Central office; Companies; Costs; Employment; Power generation; Rectifiers; Switches; Telecommunication services; Telephony;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telecommunications Energy Conference, 1994. INTELEC '94., 16th International
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-2034-4
Type :
conf
DOI :
10.1109/INTLEC.1994.396608
Filename :
396608
Link To Document :
بازگشت