DocumentCode
2642364
Title
The central office power plant of the future
Author
Kopniwsky, H.
Author_Institution
Ericsson Components AB, Stockholm
fYear
1994
fDate
30 Oct-3 Nov 1994
Firstpage
517
Lastpage
522
Abstract
The author describes an integrated system approach which would create a comprehensive power system that would have the flexibility to serve the power needs of the future central office, with systems to support multimedia and various operational support systems. All requirements for surge immunity, even higher than normal, could be met in a manner where a complete pre-engineered, pre-packaged, pre-constructed system would exist. This would remove the traditional E, F and I tasks from the process thus contributing to predictability, easy of installation, ease of expansion, higher reliability and lower service costs, less debate about how to construct each local site, better customer relations, and a higher quality system that would be verified before leaving the factory
Keywords
power system protection; surge protection; telecommunication power supplies; central office power plant; multimedia; operational support systems; power system; reliability; service costs reduction; surge immunity; Cables; Central office; Companies; Costs; Employment; Power generation; Rectifiers; Switches; Telecommunication services; Telephony;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1994. INTELEC '94., 16th International
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-2034-4
Type
conf
DOI
10.1109/INTLEC.1994.396608
Filename
396608
Link To Document