• DocumentCode
    2648887
  • Title

    Optimal preventive maintenance intervals of a rolling stock system

  • Author

    Park, Goeun ; Yun, Won Young ; Han, Young-Jin ; Kim, Jong-Woon

  • Author_Institution
    Dept. of Ind. Eng., Pusan Nat. Univ., Busan, South Korea
  • fYear
    2011
  • fDate
    17-19 June 2011
  • Firstpage
    427
  • Lastpage
    430
  • Abstract
    In this paper, we deal with a preventive maintenance (PM) scheduling problem for a rolling stock system. We want to determine the interval of PM for components in rolling stock system. The total expected cost for system life cycle and system availability are used as optimization criteria. We consider two types of PM (short-term and long-term PM). For given PM intervals, we estimate availability and life cycle cost by simulation (a commercial simulation program, AvSim). Numerical examples are also studied to investigate the effect of model parameters on the optimal solution.
  • Keywords
    life cycle costing; optimisation; preventive maintenance; railway rolling stock; scheduling; AvSim; PM intervals; PM scheduling problem; commercial simulation program; life cycle cost; long-term PM; model parameters; optimal preventive maintenance intervals; optimization criteria; preventive maintenance scheduling; rolling stock system; short-term PM; system availability; system life cycle; total expected cost; Availability; Preventive maintenance; Rail transportation; Random access memory; Schedules; life cycle cost; preventive maintenance interval; rolling stock system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2011 International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4577-1229-6
  • Type

    conf

  • DOI
    10.1109/ICQR2MSE.2011.5976645
  • Filename
    5976645