• DocumentCode
    2651815
  • Title

    Heuristic Optimization for Dual-resource Constrained Job Shop Scheduling

  • Author

    Ren Huiyuan ; Jiang Lili ; Xi Xiaoying ; Li Muzhi

  • Author_Institution
    Fac. of Electromech. Eng., Guangdong Univ. of Technol., Guangzhou
  • fYear
    2009
  • fDate
    1-2 Feb. 2009
  • Firstpage
    485
  • Lastpage
    488
  • Abstract
    In the study of job shop scheduling problem in mass injection molding processing enterprises, the practical job shop scheduling environment cannot be mirrored in the traditional study only considering machine resources. A dual-resource (machines and moulds) constrained job shop scheduling problem model was established in this paper, according to the actual factors of mass injection molding processing job shop scheduling. A heuristic active algorithm combined with priority rules is employed to give the solution. Finally, an example is made to illustrate the algorithm, whose schedule result is shown with a Gantt chart.
  • Keywords
    injection moulding; job shop scheduling; optimisation; Gantt chart; dual-resource constrained job shop scheduling; heuristic active algorithm; heuristic optimization; mass injection molding processing enterprises; Constraint optimization; Heuristic algorithms; Injection molding; Job shop scheduling; Plastic products; Plastics industry; Production; Robotics and automation; Scheduling algorithm; Single machine scheduling; dual-resource constrained; job shop scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Informatics in Control, Automation and Robotics, 2009. CAR '09. International Asia Conference on
  • Conference_Location
    Bangkok
  • Print_ISBN
    978-1-4244-3331-5
  • Type

    conf

  • DOI
    10.1109/CAR.2009.113
  • Filename
    4777286