Title :
Scheduling Semiconductor Lines Using A Fluid Network Model
Author :
Connors, Dan ; Feigin, Gerry ; Yao, Danfeng
Author_Institution :
T. J. Watson Research Center
Keywords :
Costs; Job shop scheduling; Manufacturing processes; Productivity; Q measurement; Scheduling algorithm; Semiconductor device manufacture; Semiconductor device measurement; Stochastic processes; Virtual manufacturing;
Conference_Titel :
Computer Integrated Manufacturing, 1992., Proceedings of the Third International Conference on
Print_ISBN :
0-8186-2615-1
DOI :
10.1109/CIM.1992.639055