DocumentCode :
2660881
Title :
Scheduling Semiconductor Lines Using A Fluid Network Model
Author :
Connors, Dan ; Feigin, Gerry ; Yao, Danfeng
Author_Institution :
T. J. Watson Research Center
fYear :
1992
fDate :
20-22 May 1992
Firstpage :
174
Lastpage :
183
Keywords :
Costs; Job shop scheduling; Manufacturing processes; Productivity; Q measurement; Scheduling algorithm; Semiconductor device manufacture; Semiconductor device measurement; Stochastic processes; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Integrated Manufacturing, 1992., Proceedings of the Third International Conference on
Print_ISBN :
0-8186-2615-1
Type :
conf
DOI :
10.1109/CIM.1992.639055
Filename :
639055
Link To Document :
بازگشت