DocumentCode :
2661102
Title :
Optimal short term scheduling of cascaded hydroelectric chain plants with pumped-storage units
Author :
Jiangtao, Jia ; Qiaozhu, Zhai ; Xiaohong, Guan ; Hongyu, Wu ; Qinghai, Li
Author_Institution :
SKLMS Lab., Xi´´an Jiaotong Univ., Xi´´an
fYear :
2008
fDate :
16-18 July 2008
Firstpage :
521
Lastpage :
525
Abstract :
In this paper, the short-term scheduling of cascaded hydroelectric chain plants with pumped-storage units is considered. Some integer variables are carefully introduced such that the original problem is successfully formulated as a mixed-integer linear programming. The model given in this paper admits of many complex characteristics such as nonlinear hydroelectric production function, minimum/maximum down/up time of hydro units, existence of pumped-units and time delay between plants, etc. CPLEX package is adopted to solve the problem. Numerical testing is also performed for a system with 3 cascaded reservoir, 12 hydro units and a pumped-storage plant with 5 pumped-units. The results suggest that the mixed-integer programming model given in this paper is very effective.
Keywords :
integer programming; linear programming; power engineering computing; power generation scheduling; pumped-storage power stations; CPLEX package; cascaded hydroelectric chain plant; mixed-integer linear programming; nonlinear hydroelectric production function; numerical testing; optimal short term scheduling; pumped storage units; Delay effects; Lagrangian functions; Linear programming; Optimal scheduling; Packaging; Performance evaluation; Production systems; Reservoirs; System testing; Hydroelectric production function; Mixed-integer linear programming; Pumped-storage units; Short-term hydro scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control Conference, 2008. CCC 2008. 27th Chinese
Conference_Location :
Kunming
Print_ISBN :
978-7-900719-70-6
Electronic_ISBN :
978-7-900719-70-6
Type :
conf
DOI :
10.1109/CHICC.2008.4605215
Filename :
4605215
Link To Document :
بازگشت