DocumentCode :
2675289
Title :
Finding a hybrid genetic algorithm-constraint satisfaction problem based solution for resource constrained project scheduling
Author :
Rigi, Mohammad Amin ; Mohammadi, Shahriar
Author_Institution :
IT Group, K.N. Toosi Univ. of Technol., Tehran, Iran
fYear :
2009
fDate :
19-20 Oct. 2009
Firstpage :
52
Lastpage :
56
Abstract :
Project scheduling has attracted many researchers in recent years. It is about single-item or small batch production where scarce resources have to be met when scheduling dependent activities over time. Because of high complexity of the problem uninformed search strategies cannot solve the problem optimally. This paper proposes a new evolutionary approach to resource constrained project scheduling problem. Hybrid genetic algorithm (GA)-constraint satisfaction problem (CSP) has been applied to solve resource constrained project scheduling (RCPS). GA´s task is to find the best schedule. Discussed approach has used CSP in order to overcome the existing inconsistencies in activities precedence and resources conflicts. A full state CSP with min-conflict heuristic has been used for solving precedence conflicts. And a simple iterative CSP is used to resolve the resource conflicts.
Keywords :
constraint theory; genetic algorithms; operations research; query formulation; scheduling; hybrid genetic algorithm constraint satisfaction problem; min conflict heuristic; precedence conflicts; resource constrained project scheduling; simple iterative CSP; small batch production; uninformed search strategies; Genetics; Scheduling algorithm; constraint satisfaction problem; genetic algorithm; min-conflict heuristic; project scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Emerging Technologies, 2009. ICET 2009. International Conference on
Conference_Location :
Islamabad
Print_ISBN :
978-1-4244-5630-7
Electronic_ISBN :
978-1-4244-5631-4
Type :
conf
DOI :
10.1109/ICET.2009.5353201
Filename :
5353201
Link To Document :
بازگشت