  • Abstract
    At the 2005 general meeting of the Power Engineering Society held in San Francisco, California, the Southern African Power Pool and NEPAD flagship project, the Western Power Corridor, was presented. This paper updates the project diary of events, presents the next steps for the pre-feasibility studies and records the closure of the first pass planning studies to yield the proposal of extra high voltage DC transmission coupled with run of the river hydro generation
  • Keywords
    HVDC power transmission; hydroelectric power stations; power transmission planning; California; NEPAD; Power Engineering Society; San Francisco; Southern African Power Pool; Western Power Corridor Project; extra high voltage DC transmission; river hydro generation; Africa; Costs; Feedback; HVDC transmission; Power engineering and energy; Power generation; Power markets; Power transmission lines; Rivers; Voltage; Feasibility Studies; HVDC Transmission; Hydro Generation Introduction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2006. IEEE
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    1-4244-0493-2
  • Type

    conf

  • DOI
    10.1109/PES.2006.1709210
  • Filename
    1709210