• DocumentCode
    2678741
  • Title

    Vectren´s Experience with Operating Genco Assets in MISO Market

  • Author

    Lisembee, Brad ; Morris, Kevin

  • Author_Institution
    Vectren, Evansville, Indiana
  • fYear
    2006
  • fDate
    18-22 June 2006
  • Firstpage
    1
  • Lastpage
    1
  • Abstract
    This paper summarizes Vectren´s experience with operating generation assets in the MISO Day-2 market. The paper will address the following topics: ■ Forecasting day-ahead loads and LMPs ■ Evaluation of day-ahead bidding strategies ■ Reviewing offer data to make sure that they pass market-mitigation tests ■ Developing strategies for deciding when to offer units as must run vs. economic. ■ Post-analyzing day-ahead strategies to check whether SCUC schedules are optimal for Vectren ■ Formulating methods for pricing combustion turbines ■ Working with RTO to resolve problems with real-time dispatch, causing LMP oscillations and large LMP spikes ■ Management of settlement disputes
  • Keywords
    Combustion; Economic forecasting; Load forecasting; Power generation; Power generation economics; Pricing; Testing; Turbines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2006. IEEE
  • Print_ISBN
    1-4244-0493-2
  • Type

    conf

  • DOI
    10.1109/PES.2006.1709271
  • Filename
    1709271