DocumentCode
2678741
Title
Vectren´s Experience with Operating Genco Assets in MISO Market
Author
Lisembee, Brad ; Morris, Kevin
Author_Institution
Vectren, Evansville, Indiana
fYear
2006
fDate
18-22 June 2006
Firstpage
1
Lastpage
1
Abstract
This paper summarizes Vectren´s experience with operating generation assets in the MISO Day-2 market. The paper will address the following topics: ■ Forecasting day-ahead loads and LMPs ■ Evaluation of day-ahead bidding strategies ■ Reviewing offer data to make sure that they pass market-mitigation tests ■ Developing strategies for deciding when to offer units as must run vs. economic. ■ Post-analyzing day-ahead strategies to check whether SCUC schedules are optimal for Vectren ■ Formulating methods for pricing combustion turbines ■ Working with RTO to resolve problems with real-time dispatch, causing LMP oscillations and large LMP spikes ■ Management of settlement disputes
Keywords
Combustion; Economic forecasting; Load forecasting; Power generation; Power generation economics; Pricing; Testing; Turbines;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2006. IEEE
Print_ISBN
1-4244-0493-2
Type
conf
DOI
10.1109/PES.2006.1709271
Filename
1709271
Link To Document