Title :
Notice of Retraction
A Fuzzy EDF scheduling algorithm being suitable for embedded soft real-time systems in the uncertain environments
Author :
Xian-Bo He ; Gang-Yuan Zhang ; Min Liu ; Yu-Ping Zhao ; Wei Li
Author_Institution :
Sch. of Comput. Sci., China West Normal Univ., NanChong, China
Abstract :
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
EDF is a classic dynamic real-time task scheduling algorithm. In an embedded soft real-time system, the deadline missing ratio is an important metric to evaluate system performance. When an embedded soft real-time system is overloaded, EDF algorithm is not effective. In addition, considering the unsteadiness and unpredictability of a practical task running environment due to the unsteadiness of network communication and the time estimation deviation, it is necessary to introduce fuzzy concept and theory to the scheduling field of embedded soft real-time application systems. In this paper, we proposed a fuzzy EDF scheduling model which is more suitable for embedded soft real-time systems in the uncertain environment. In our model, all tasks are periodic and a task´s criticality and deadline distance are described with fuzzy set. In scheduling algorithm, tasks with shorter fuzzy deadline distance are scheduled first; to those with same fuzzy deadline distance level, their criticalities are considered first. The simulation test shows that our fuzzy EDF model have less deadline missing ratios than those of traditional EDF algorithm and the important tasks have less deadline missing ratios than that of others tasks in an overloaded uncertain embedded soft real-time system.
Keywords :
computer networks; dynamic scheduling; embedded systems; fuzzy set theory; performance evaluation; uncertain systems; deadline distance; deadline missing ratio; dynamic real-time task scheduling; earliest deadline first; embedded soft real-time systems; fuzzy EDF scheduling algorithm; network communication; practical task running environment; simulation test; system performance evaluation; time estimation deviation; uncertain environments; unpredictability; unsteadiness; Computer science; Dynamic scheduling; Fuzzy sets; Fuzzy systems; Helium; Performance analysis; Real time systems; Scheduling algorithm; System performance; System testing; Deadline missing ratio; EDF; Fuzzify;
Conference_Titel :
Advanced Computer Control (ICACC), 2010 2nd International Conference on
Conference_Location :
Shenyang
Print_ISBN :
978-1-4244-5845-5
DOI :
10.1109/ICACC.2010.5487135