Title
Preliminary construction and cost analysis for tie IGNITEX fusion facility
Author
Cooper, P. ; Booth ; Borcherding, J. ; Carrera ; Gully ; Parish ; Quinones, J. ; Raj, Milan ; Walls ; Weldon ; Werst
fYear
1990
fDate
21-23 May 1990
Firstpage
99
Abstract
Summary form only given. A project schedule that includes a design phase, a construction and commissioning phase, and an operation phase has been developed for IGNITEX. A cost model that includes entries for the various subsystems of the IGNITEX experiment and facility has been formulated. As a result, a preliminary cost breakdown was obtained. The cost of constructing IGNITEX was estimated by including a 15% contingency. The total cost of construction has been preliminarily estimated to be about $130 M. A schedule of three years for construction and commissioning has been assumed. Cost scaling relationships for IGNITEX were developed, and cost breakdowns were evaluated for the small and large versions of the IGNITEX experiment. Some preliminary site requirements for the IGNITEX facility were obtained. Simplifying characteristics that permit substantial cost savings over conventional approaches were defined
Keywords
economics; fusion reactor operation; IGNITEX fusion facility; commissioning phase; construction; cost analysis; operation phase; project schedule; scaling relationships; subsystems;
fLanguage
English
Publisher
ieee
Conference_Titel
Plasma Science, 1990. IEEE Conference Record - Abstracts., 1990 IEEE International Conference on
Conference_Location
Oakland, CA, USA
Type
conf
DOI
10.1109/PLASMA.1990.110544
Filename
5725820
Link To Document