    Preliminary construction and cost analysis for tie IGNITEX fusion facility

  • Author

    Cooper, P. ; Booth ; Borcherding, J. ; Carrera ; Gully ; Parish ; Quinones, J. ; Raj, Milan ; Walls ; Weldon ; Werst

  • fYear
    1990
  • fDate
    21-23 May 1990
  • Firstpage
    99
  • Abstract
    Summary form only given. A project schedule that includes a design phase, a construction and commissioning phase, and an operation phase has been developed for IGNITEX. A cost model that includes entries for the various subsystems of the IGNITEX experiment and facility has been formulated. As a result, a preliminary cost breakdown was obtained. The cost of constructing IGNITEX was estimated by including a 15% contingency. The total cost of construction has been preliminarily estimated to be about $130 M. A schedule of three years for construction and commissioning has been assumed. Cost scaling relationships for IGNITEX were developed, and cost breakdowns were evaluated for the small and large versions of the IGNITEX experiment. Some preliminary site requirements for the IGNITEX facility were obtained. Simplifying characteristics that permit substantial cost savings over conventional approaches were defined
  • Keywords
    economics; fusion reactor operation; IGNITEX fusion facility; commissioning phase; construction; cost analysis; operation phase; project schedule; scaling relationships; subsystems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Plasma Science, 1990. IEEE Conference Record - Abstracts., 1990 IEEE International Conference on
  • Conference_Location
    Oakland, CA, USA
  • Type

    conf

  • DOI
    10.1109/PLASMA.1990.110544
  • Filename
    5725820