Preliminary construction and cost analysis for tie IGNITEX fusion facility
Author :
Cooper, P. ; Booth ; Borcherding, J. ; Carrera ; Gully ; Parish ; Quinones, J. ; Raj, Milan ; Walls ; Weldon ; Werst
fYear :
1990
fDate :
21-23 May 1990
Firstpage :
99
Abstract :
Summary form only given. A project schedule that includes a design phase, a construction and commissioning phase, and an operation phase has been developed for IGNITEX. A cost model that includes entries for the various subsystems of the IGNITEX experiment and facility has been formulated. As a result, a preliminary cost breakdown was obtained. The cost of constructing IGNITEX was estimated by including a 15% contingency. The total cost of construction has been preliminarily estimated to be about $130 M. A schedule of three years for construction and commissioning has been assumed. Cost scaling relationships for IGNITEX were developed, and cost breakdowns were evaluated for the small and large versions of the IGNITEX experiment. Some preliminary site requirements for the IGNITEX facility were obtained. Simplifying characteristics that permit substantial cost savings over conventional approaches were defined
Keywords :
economics; fusion reactor operation; IGNITEX fusion facility; commissioning phase; construction; cost analysis; operation phase; project schedule; scaling relationships; subsystems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Plasma Science, 1990. IEEE Conference Record - Abstracts., 1990 IEEE International Conference on
Conference_Location :
Oakland, CA, USA
Type :
conf
DOI :
10.1109/PLASMA.1990.110544
Filename :
5725820
Link To Document :
بازگشت