• DocumentCode
    2684845
  • Title

    The strategy research of maintenance and replacement under multi-constraint

  • Author

    Hu, Zhiyong ; Xie, Liyang ; Zhang, Xiaojin ; Qiu, Zhaoguo

  • Author_Institution
    Sch. of Machine & Autom., Northeastern Univ., Shenyang, China
  • fYear
    2011
  • fDate
    12-15 June 2011
  • Firstpage
    854
  • Lastpage
    858
  • Abstract
    This paper establishes lifetime return model of equipment taking account to constraint of production management of enterprise and constraint of equipment reliability. By introducing numerical example, two optimal preventive maintenance (PM) and renewing strategies which are under two sets of deferent variables are compared. By analyzing results some can be concluded: a limited times of PM promotes the lifetime return of equipment; contrary excessive PM leads to the reduction of lifetime return of equipment; optimal PM and renewing strategy maybe obtain maximum equipment lifetime return either in shorter lifetime or less times of PM; the characteristic of process of optimal PM has no aftereffect.
  • Keywords
    constraint theory; preventive maintenance; production equipment; production management; reliability; strategic planning; equipment reliability; lifetime return model; maintenance strategy; multiconstraint; preventive maintenance; production management; renewing strategies; replacement; Numerical models; Preventive maintenance; Reliability engineering; Reliability theory; Servers; Reliability; age reduction; lifetime; no aftereffect; preventive maintenance; production management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability, Maintainability and Safety (ICRMS), 2011 9th International Conference on
  • Conference_Location
    Guiyang
  • Print_ISBN
    978-1-61284-667-5
  • Type

    conf

  • DOI
    10.1109/ICRMS.2011.5979385
  • Filename
    5979385