DocumentCode
2684845
Title
The strategy research of maintenance and replacement under multi-constraint
Author
Hu, Zhiyong ; Xie, Liyang ; Zhang, Xiaojin ; Qiu, Zhaoguo
Author_Institution
Sch. of Machine & Autom., Northeastern Univ., Shenyang, China
fYear
2011
fDate
12-15 June 2011
Firstpage
854
Lastpage
858
Abstract
This paper establishes lifetime return model of equipment taking account to constraint of production management of enterprise and constraint of equipment reliability. By introducing numerical example, two optimal preventive maintenance (PM) and renewing strategies which are under two sets of deferent variables are compared. By analyzing results some can be concluded: a limited times of PM promotes the lifetime return of equipment; contrary excessive PM leads to the reduction of lifetime return of equipment; optimal PM and renewing strategy maybe obtain maximum equipment lifetime return either in shorter lifetime or less times of PM; the characteristic of process of optimal PM has no aftereffect.
Keywords
constraint theory; preventive maintenance; production equipment; production management; reliability; strategic planning; equipment reliability; lifetime return model; maintenance strategy; multiconstraint; preventive maintenance; production management; renewing strategies; replacement; Numerical models; Preventive maintenance; Reliability engineering; Reliability theory; Servers; Reliability; age reduction; lifetime; no aftereffect; preventive maintenance; production management;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability, Maintainability and Safety (ICRMS), 2011 9th International Conference on
Conference_Location
Guiyang
Print_ISBN
978-1-61284-667-5
Type
conf
DOI
10.1109/ICRMS.2011.5979385
Filename
5979385
Link To Document