Abstract :
The paper presents results of reliability analysis made for the 370 MW power units installed in the Belchatow Power Station (Poland). The concept of standardized power unit and the method of a histogram with a set number of observations in each class was applied in a study. The study includes analysis of probability distributions of operation times and repair times for the main power unit components. Empirical probability distribution functions are identified and their parameters are estimated in the study. The final forecast includes an estimation of such reliability measures like expected operation time, expected failure rate, average repair time and expected annual failure duration.
Keywords :
power system reliability; probability; operation times; power 370 MW; power system reliability; probability distributions; reliability analysis; repair times; standardized power unit; Availability; Control systems; Europe; Frequency; Histograms; Power engineering; Power engineering computing; Power generation; Power system reliability; Probability distribution; power station; power system reliability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Power Quality and Utilisation, 2007. EPQU 2007. 9th International Conference on
Conference_Location :
Barcelona
Print_ISBN :
978-84-690-9441-9
Electronic_ISBN :
978-84-690-9441-9
Type :
conf
DOI :
10.1109/EPQU.2007.4424188
Filename :
4424188
Link To Document :
بازگشت