Abstract
The paper describes the installation of the world´s first Interphase Power Controller (IPC) at the New York Power Authority Plattsburgh substation, on the 115 kV tie that interconnects the NYPA and VELCO systems. The objective of converting the existing phase-shifting transformers (PST) into an IPC is to raise the pre-contingency summer transfer capability that was constrained by the PST rating, to winter transfer levels, which are normally voltage limited
Keywords
controllers; phase shifters; power control; power system control; power system interconnection; power transformers; substations; 115 kV; New York Power Authority; Plattsburgh Interphase Power Controller; Plattsburgh substation; VELCO system; phase-shifting transformers; power system interconnection; pre-contingency summer transfer capability; winter transfer levels; Capacitors; Control systems; IEEE members; Impedance; Inductors; Integrated circuit interconnections; Load flow; Power system interconnection; Power system reliability; Voltage control;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference, 1999 IEEE
Conference_Location
New Orleans, LA
Print_ISBN
0-7803-5515-6
Type
conf
DOI
10.1109/TDC.1999.756127
Filename
756127
Link To Document