DocumentCode
2692111
Title
A p-time hybrid Petri net model for the scheduling problem of workflow management systems
Author
Julia, Stéphane ; De Oliveira, Femanda Francielle
Author_Institution
Univ. Federal de Uberlandia, Brazil
Volume
5
fYear
2004
fDate
10-13 Oct. 2004
Firstpage
4947
Abstract
An approach based on a p-time hybrid Petri net model is proposed to solve the scheduling problem of workflow management systems. The proposed approach uses an activity diagram to show the main activities of the system and the different routings of the workflow process. Based on the obtained activity diagram, the corresponding p-time Petri net model is produced by assigning a time interval to every workflow activity. Hybrid resource allocation mechanisms are modeled by hybrid Petri net with discrete transitions where discrete resources represent equipment and continuous resources represent employees. Finally, a token player algorithm is applied to an example of "handle complaint process" in order to obtain an acceptable scenario corresponding to a specific sequence of activities which respects the time constraints (the previsional delivery delays).
Keywords
Petri nets; delays; resource allocation; scheduling; workflow management software; handle complaint process; hybrid resource allocation mechanisms; p-time hybrid Petri net model; previsional delivery delays; scheduling problem; token player algorithm; workflow management systems; Delay effects; Job shop scheduling; Processor scheduling; Production systems; Real time systems; Resource management; Routing; Time factors; Unified modeling language; Workflow management software;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2004 IEEE International Conference on
ISSN
1062-922X
Print_ISBN
0-7803-8566-7
Type
conf
DOI
10.1109/ICSMC.2004.1401315
Filename
1401315
Link To Document