• DocumentCode
    2692567
  • Title

    Leadtime and quantity decision in assembly system with spot market

  • Author

    Chu, Hongsheng ; Wang, Jin-Schun ; Jin, Yihui

  • Author_Institution
    Dept. of Autom., Tsinghua Univ., Beijing, China
  • Volume
    7
  • fYear
    2004
  • fDate
    10-13 Oct. 2004
  • Firstpage
    6021
  • Abstract
    A two-stage assembly system is considered. An assembler procures associated component parts and assembles final products to fulfill a random quantity of demand. The final product must be delivered in a certain time; otherwise a delay cost is incurred. Lead times of the components are independent stochastic variables. And, in our model, except regular channels from which the components is procured before the demand reason, components spot markets exist for the need when ordered quantity is not enough. That is, we consider random demand quantity and random operation times at the same time in an assembly system with components spot market. The objective is to minimize the total expected cost. We investigate the structure of optimal operation time plan and quantity decision. The analytical and heuristics numerical result manifest some management insights of the system.
  • Keywords
    assembly planning; lead time reduction; minimisation; stochastic processes; delay cost; independent stochastic variables; leadtime decision; optimal operation time plan; quantity decision; random demand quantity; random operation times; spot market; two-stage assembly system; Assembly systems; Automation; Costs; Delay effects; Electronic commerce; Globalization; Manufacturing; Stochastic processes; Stochastic systems; Supply chains;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 2004 IEEE International Conference on
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-8566-7
  • Type

    conf

  • DOI
    10.1109/ICSMC.2004.1401342
  • Filename
    1401342