ZR Marx capacitor vendor evaluation results and procurement strategy
Author :
Smith, David L. ; Savage, Mark E. ; Maenchen, John E. ; McDaniel, Dillon H. ; Slattery, Michael J. ; Weinbrecht, Edward A. ; Kitterman, David L. ; Starbird, Robert L.
Author_Institution :
Sandia Nat. Labs., Albuquerque, NM, USA
Volume :
2
fYear :
2003
fDate :
15-18 June 2003
Firstpage :
1205
Abstract :
To meet or exceed the 26-MA goal for ZR, the refurbished upgrade to the Z machine at Sandia National Labs, the existing Marx generator capacitors is replaced with identical size units but with twice the capacitance. Before the six-month shut down and transition from Z to ZR occurs in late 2005, most of the 2500 capacitors are delivered for acceptance testing and installation. We chose to undertake an ambitious vendor qualification program to reduce the risk of not meeting ZR performance goals, to encourage the pulsed- power industry to revisit the design and development of high energy discharge capacitors, and to meet the cost and delivery schedule within the ZR project plans. Five manufacturers were willing to fabricate and sell Sandia samples of six capacitors each to be evaluated. In addition, four more samples of modified or alternate designs were submitted for testing at the vendors´ expense, giving us a total of 45 capacitors to test. The 8,000-shot qualification test phase of the effort is now complete. This paper summarizes how the 0.279x0.356x0.635-m Scyllac-style 2.6-/spl mu/F, <30-nH, 100-kV, 35%-reversal capacitor lifetime specifications is determined, briefly describes the nominal 260-kJ test facility configuration, presents the test results of the most successful candidates, and provides procurement strategy and acceptance testing protocols that balance available resources against performance, cost, and schedule risk.
Keywords :
capacitors; discharges (electric); pulse generators; pulsed power supplies; 100 kV; 2.6 muF; Marx generator capacitors; Sandia National Labs; ZR Marx capacitor vendor evaluation; acceptance testing protocols; cost schedule; delivery schedule; high energy discharge capacitors; procurement strategy; pulsed- power industry; reversal capacitor lifetime specifications; test facility configuration; Capacitance; Capacitors; Costs; Job shop scheduling; Life testing; Meeting planning; Power industry; Procurement; Qualifications; Zirconium;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulsed Power Conference, 2003. Digest of Technical Papers. PPC-2003. 14th IEEE International
Conference_Location :
Dallas, TX, USA
Print_ISBN :
0-7803-7915-2
Type :
conf
DOI :
10.1109/PPC.2003.1278029
Filename :
1278029
Link To Document :
بازگشت