• DocumentCode
    2695754
  • Title

    Multi-objective particle swarm optimization algorithm for scheduling in flowshops to minimize makespan, total flowtime and completion time variance

  • Author

    Chandrasekaran, S. ; Ponnambalam, S.G. ; Suresh, R.K. ; Vijayakumar, N.

  • Author_Institution
    Sri Ramakrishna Mission Vidyalaya Polytech. Coll., Coimbatore
  • fYear
    2007
  • fDate
    25-28 Sept. 2007
  • Firstpage
    4012
  • Lastpage
    4018
  • Abstract
    The present work deals with the development of particle swarm optimization algorithm to solve the multi-objective flowshop scheduling problem. In this paper, minimization of makespan, total flowtime and completion time variance are considered simultaneously. Performance of the proposed methodology has been tested by solving benchmark scheduling problems available in the literature. The proposed methodology is guided to search a set of non-dominated solutions close to the Pareto front. The search capability of the proposed PSO algorithm is enhanced using a local search mechanism. This work is a preliminary step in our research to identify the reference or Pareto solution sets for the benchmark FSPs proposed in the literature, when (Cmax), (tft) and (ctv) are to be simultaneously optimized.
  • Keywords
    Pareto optimisation; manufacturing systems; minimisation; particle swarm optimisation; scheduling; search problems; Pareto front; Pareto solution sets; completion time variance; flowshop scheduling; local search mechanism; makespan minimization; multiobjective particle swarm optimization algorithm; Evolutionary computation; Particle swarm optimization; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Evolutionary Computation, 2007. CEC 2007. IEEE Congress on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-1339-3
  • Electronic_ISBN
    978-1-4244-1340-9
  • Type

    conf

  • DOI
    10.1109/CEC.2007.4424994
  • Filename
    4424994