DocumentCode
2698506
Title
Integral inference method of incomplete reliability information with reliability growth model under delayed fix mode
Author
Ao, Liang ; Wang, Qihua ; Wang, Xin
Author_Institution
China Aero-Polytechnology Establ., Beijing, China
fYear
2012
fDate
15-18 June 2012
Firstpage
339
Lastpage
341
Abstract
In order to solve the reliability estimation with incomplete reliability information in different development stages of products, an integral inference method is given in this paper. By using the maximum likelihood method, the log-likelihood function for the type-I censored and grouped data is established. The point estimation of parameters and the covariance between them are also obtained. At last, a lot of Monte Carlo simulation is adopted to prove the method given in this paper is better than the traditional method. Because the method given in this paper can make the reliability data in different stages an integral for statistical analysis, it can reach higher precision than the traditional method.
Keywords
Monte Carlo methods; covariance analysis; maximum likelihood estimation; product development; reliability; Monte Carlo simulation; covariance; delayed fix mode; log-likelihood function; maximum likelihood method; ntegral inference method; point estimation; reliability growth model; statistical analysis; type-I censored and grouped data; Estimation; Reliability; Tin; delayed fix mode; integral inference; reliability growth model;
fLanguage
English
Publisher
ieee
Conference_Titel
Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2012 International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4673-0786-4
Type
conf
DOI
10.1109/ICQR2MSE.2012.6246249
Filename
6246249
Link To Document