• DocumentCode
    2698506
  • Title

    Integral inference method of incomplete reliability information with reliability growth model under delayed fix mode

  • Author

    Ao, Liang ; Wang, Qihua ; Wang, Xin

  • Author_Institution
    China Aero-Polytechnology Establ., Beijing, China
  • fYear
    2012
  • fDate
    15-18 June 2012
  • Firstpage
    339
  • Lastpage
    341
  • Abstract
    In order to solve the reliability estimation with incomplete reliability information in different development stages of products, an integral inference method is given in this paper. By using the maximum likelihood method, the log-likelihood function for the type-I censored and grouped data is established. The point estimation of parameters and the covariance between them are also obtained. At last, a lot of Monte Carlo simulation is adopted to prove the method given in this paper is better than the traditional method. Because the method given in this paper can make the reliability data in different stages an integral for statistical analysis, it can reach higher precision than the traditional method.
  • Keywords
    Monte Carlo methods; covariance analysis; maximum likelihood estimation; product development; reliability; Monte Carlo simulation; covariance; delayed fix mode; log-likelihood function; maximum likelihood method; ntegral inference method; point estimation; reliability growth model; statistical analysis; type-I censored and grouped data; Estimation; Reliability; Tin; delayed fix mode; integral inference; reliability growth model;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2012 International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4673-0786-4
  • Type

    conf

  • DOI
    10.1109/ICQR2MSE.2012.6246249
  • Filename
    6246249