DocumentCode
2702345
Title
Flexible Flow Shop Scheduling by Intelligent Multi-agents
Author
Weng, Wei ; Fujimura, Shigeru
Author_Institution
Grad. Sch. of Inf., Production, & Syst., Waseda Univ., Fukuoka, Japan
fYear
2010
fDate
24-26 May 2010
Firstpage
113
Lastpage
120
Abstract
This paper presents some important improvements to a previously proposed intelligent production system dealing with a dynamic flexible flow shop scheduling problem under a multi-stage multi-machine factory environment. These improvements greatly help upgrade the overall system performance under stable demand situations as well as under fluctuated demand situations, build the system robust against demand increase, and raise the system’s machine utilization rate. The research objective is to minimize the total earliness and tardiness penalties of all jobs during any given period of time. The system works on the basis of multi-agent feedbacks that are conducted by agents which collect realtime information, make decisions, and work interactively to give corresponding solutions to each job. Comparison between the previous system and the improved one has been carried out, and the experimental results demonstrate the effectiveness of the proposed improvements under various system situations.
Keywords
Dynamic scheduling; Feedback; Flow production systems; Intelligent systems; Job shop scheduling; Life testing; Machine intelligence; Processor scheduling; Production facilities; System performance;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Engineering Research, Management and Applications (SERA), 2010 Eighth ACIS International Conference on
Conference_Location
Montreal, QC, Canada
Print_ISBN
978-0-7695-4075-7
Electronic_ISBN
978-1-4244-7337-3
Type
conf
DOI
10.1109/SERA.2010.24
Filename
5489102
Link To Document