• DocumentCode
    2702345
  • Title

    Flexible Flow Shop Scheduling by Intelligent Multi-agents

  • Author

    Weng, Wei ; Fujimura, Shigeru

  • Author_Institution
    Grad. Sch. of Inf., Production, & Syst., Waseda Univ., Fukuoka, Japan
  • fYear
    2010
  • fDate
    24-26 May 2010
  • Firstpage
    113
  • Lastpage
    120
  • Abstract
    This paper presents some important improvements to a previously proposed intelligent production system dealing with a dynamic flexible flow shop scheduling problem under a multi-stage multi-machine factory environment. These improvements greatly help upgrade the overall system performance under stable demand situations as well as under fluctuated demand situations, build the system robust against demand increase, and raise the system’s machine utilization rate. The research objective is to minimize the total earliness and tardiness penalties of all jobs during any given period of time. The system works on the basis of multi-agent feedbacks that are conducted by agents which collect realtime information, make decisions, and work interactively to give corresponding solutions to each job. Comparison between the previous system and the improved one has been carried out, and the experimental results demonstrate the effectiveness of the proposed improvements under various system situations.
  • Keywords
    Dynamic scheduling; Feedback; Flow production systems; Intelligent systems; Job shop scheduling; Life testing; Machine intelligence; Processor scheduling; Production facilities; System performance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Software Engineering Research, Management and Applications (SERA), 2010 Eighth ACIS International Conference on
  • Conference_Location
    Montreal, QC, Canada
  • Print_ISBN
    978-0-7695-4075-7
  • Electronic_ISBN
    978-1-4244-7337-3
  • Type

    conf

  • DOI
    10.1109/SERA.2010.24
  • Filename
    5489102