DocumentCode :
2704200
Title :
A Flexible Transformation Scheme between the ´OR´ of BPMN and ´Link´ of BPEL
Author :
Bai, Lin ; Wei, Jun
Author_Institution :
Inst. of Software, Chinese Acad. of Sci., Beijing
fYear :
2008
fDate :
9-12 Dec. 2008
Firstpage :
1300
Lastpage :
1307
Abstract :
BPMN and BPEL are two process modeling languages with different syntax and semantics. Overriding their gaps to improve interoperability is one of the key issues in current service computing research. Recent works about the transformation between BPMN and BPEL mostly focus on a limited set of elements or well-formed structures. This paper expands the traditional methods by considering the multi-semantic element dasiaORpsila of BPMN and the non-structured element dasiaLinkpsila of BPEL. Furthermore, we present a flexible transformation scheme for them based on semantics equivalence and we finally designed and developed a prototype tool to implement our strategy. Our work is of great significance in relaxing the restriction on transformation between BPMN and BPEL and thus satisfying more business requirements.
Keywords :
business data processing; program interpreters; programming language semantics; specification languages; BPEL; BPMN; business process execution language; business process modeling notation; business requirements; flexible transformation scheme; multisemantic element; nonstructured element; semantic equivalence; Algorithm design and analysis; Computer languages; Engines; Natural languages; Process design; Prototypes; Web services;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Asia-Pacific Services Computing Conference, 2008. APSCC '08. IEEE
Conference_Location :
Yilan
Print_ISBN :
978-0-7695-3473-2
Electronic_ISBN :
978-0-7695-3473-2
Type :
conf
DOI :
10.1109/APSCC.2008.147
Filename :
4780859
Link To Document :
بازگشت