DocumentCode
2712311
Title
Introducing series compensation in the UK transmission network
Author
Hor, C. ; Finn, Joseph ; Thumm, G. ; Mortimer, S.
Author_Institution
Siemens Transm. & Distrib. Ltd., Manchester, UK
fYear
2010
fDate
19-21 Oct. 2010
Firstpage
1
Lastpage
5
Abstract
This paper highlights several key aspects of introducing series compensation (SC) in the UK transmission network and those requirements which would require the use of thyristor controlled series capacitors (TCSC) rather than the simpler fixed series capacitor (FSC) option. The paper then indicates how the main component values can be derived, provided that a clear functional specification is provided indicating the required level of compensation, steady state currents and overload currents. It also indicates a possible issue with regard to the number of times that the capacitor can remain in service under severe storm conditions with successful auto recloses which may require exceedingly large MO Vs.
Keywords
power capacitors; transmission networks; UK transmission network; fixed series capacitor; overload currents; series compensation; steady state currents; thyristor controlled series capacitors; FACTS and SSR; FSC; TCSC; TPSC;
fLanguage
English
Publisher
iet
Conference_Titel
AC and DC Power Transmission, 2010. ACDC. 9th IET International Conference on
Conference_Location
London
Type
conf
DOI
10.1049/cp.2010.0967
Filename
5727999
Link To Document