• DocumentCode
    2712311
  • Title

    Introducing series compensation in the UK transmission network

  • Author

    Hor, C. ; Finn, Joseph ; Thumm, G. ; Mortimer, S.

  • Author_Institution
    Siemens Transm. & Distrib. Ltd., Manchester, UK
  • fYear
    2010
  • fDate
    19-21 Oct. 2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper highlights several key aspects of introducing series compensation (SC) in the UK transmission network and those requirements which would require the use of thyristor controlled series capacitors (TCSC) rather than the simpler fixed series capacitor (FSC) option. The paper then indicates how the main component values can be derived, provided that a clear functional specification is provided indicating the required level of compensation, steady state currents and overload currents. It also indicates a possible issue with regard to the number of times that the capacitor can remain in service under severe storm conditions with successful auto recloses which may require exceedingly large MO Vs.
  • Keywords
    power capacitors; transmission networks; UK transmission network; fixed series capacitor; overload currents; series compensation; steady state currents; thyristor controlled series capacitors; FACTS and SSR; FSC; TCSC; TPSC;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    AC and DC Power Transmission, 2010. ACDC. 9th IET International Conference on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/cp.2010.0967
  • Filename
    5727999