DocumentCode
2716719
Title
Power and backup power considerations for the ISDN network termination 1 (NT1)
Author
Mistry, K.M. ; Moisan, K.J. ; O´Sullivan, T.D.
Author_Institution
Bellcore, Morristown, NJ, USA
fYear
1990
fDate
22-25 Oct. 1990
Firstpage
16
Lastpage
21
Abstract
The evolution to a narrowband integrated services digital network (ISDN) necessitates the installation of additional electronics at the user end of the loop. Providing power and backup power for these electronics (referred to as the network termination 1 (NT1)) offers challenges to designers. One problem is that reliability and backup powering are not currently addressed in a uniform manner in the US. For locally provided power, the authors propose baseline criteria for reliability and backup powering. One generic topology comprising a power supply, a battery charger, and secondary batteries is presented. A backup time of eight hours is proposed with an option for additional backup provided via an extended reserve cabinet using primary or secondary batteries.<>
Keywords
ISDN; battery chargers; emergency power supply; power supplies to apparatus; secondary cells; ISDN; backup powering; battery charger; narrowband integrated services digital network; network termination 1; power supply; reliability; reserve cabinet; secondary batteries; Batteries; Electrical safety; FCC; ISDN; Narrowband; Power supplies; Power system modeling; Power system reliability; Power systems; Topology;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1990. INTELEC '90., 12th International
Conference_Location
Orlando, FL, USA
Type
conf
DOI
10.1109/INTLEC.1990.171219
Filename
171219
Link To Document