• DocumentCode
    2717302
  • Title

    Proper setting of underfrequency load shedding relays in industrial plants

  • Author

    Khaki, Behnam ; Kouhsari, Shahram Montaser

  • Author_Institution
    Dept. of Electr. Eng., Amirkabir Univ. of Technol., Tehran, Iran
  • fYear
    2010
  • fDate
    16-19 May 2010
  • Firstpage
    198
  • Lastpage
    201
  • Abstract
    Underfrequency relays are the most reliable tools for load shedding in active power generation deficiency conditions especially industrial power systems. In this paper, a new algorithm is proposed to set underfrequency load shedding relays based on transient stability studies (frequency dynamic study). The proposed algorithm utilizes a comprehensive transient stability module to find out the unwanted events which are not safe for the operation of the plant and the load shedding actions are unavoidable. Underfrequency load shedding relays are set in such a way that the power system preserves the electricity in service for critical loads and frequency is maintained in permissible limits. The application of the proposed method on a test case is described and the results and related discussions are presented.
  • Keywords
    Frequency; Industrial plants; Industrial power systems; Power generation; Power system dynamics; Power system relaying; Power system reliability; Power system stability; Power system transients; Relays; frequency dynamic; industrial power system; transient stability; underfrequency load shedding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Environment and Electrical Engineering (EEEIC), 2010 9th International Conference on
  • Conference_Location
    Prague, Czech Republic
  • Print_ISBN
    978-1-4244-5370-2
  • Electronic_ISBN
    978-1-4244-5371-9
  • Type

    conf

  • DOI
    10.1109/EEEIC.2010.5489970
  • Filename
    5489970