DocumentCode
2718827
Title
The long-term transmission & substation plan in Korea power system
Author
Oh, Hyeon-jin ; Won, Young-jin ; Hwang, Jong-young
fYear
2009
fDate
26-30 Oct. 2009
Firstpage
1
Lastpage
5
Abstract
According to the Electricity Enterprises Act, The Chief of Ministry Knowledge Economy has to release ¿the Basic Plan for long term Electricity supply & demand¿ biannually in order to stabilize Korea electric power system. The Basic Plan for long term Electricity supply & demand is composed of government power policy, long-term power demand forecast, power plant expansion plan and so on. The planning period is 15 years considering nuclear power plant construction period. It was released on 29, Dec. 2008.
Keywords
load forecasting; power transmission economics; power transmission planning; substations; Korea power system; electricity enterprises act; electricity supply & demand; government power policy; knowledge economy; long-term transmission; power demand forecast; power plant expansion plan; substation plan; Capacity planning; Distributed parameter circuits; Government; Mesh generation; Power generation; Power grids; Power system management; Power systems; Power transmission lines; Substations;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Conference & Exposition: Asia and Pacific, 2009
Conference_Location
Seoul
Print_ISBN
978-1-4244-5230-9
Electronic_ISBN
978-1-4244-5230-9
Type
conf
DOI
10.1109/TD-ASIA.2009.5356821
Filename
5356821
Link To Document