• DocumentCode
    2718827
  • Title

    The long-term transmission & substation plan in Korea power system

  • Author

    Oh, Hyeon-jin ; Won, Young-jin ; Hwang, Jong-young

  • fYear
    2009
  • fDate
    26-30 Oct. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    According to the Electricity Enterprises Act, The Chief of Ministry Knowledge Economy has to release ¿the Basic Plan for long term Electricity supply & demand¿ biannually in order to stabilize Korea electric power system. The Basic Plan for long term Electricity supply & demand is composed of government power policy, long-term power demand forecast, power plant expansion plan and so on. The planning period is 15 years considering nuclear power plant construction period. It was released on 29, Dec. 2008.
  • Keywords
    load forecasting; power transmission economics; power transmission planning; substations; Korea power system; electricity enterprises act; electricity supply & demand; government power policy; knowledge economy; long-term transmission; power demand forecast; power plant expansion plan; substation plan; Capacity planning; Distributed parameter circuits; Government; Mesh generation; Power generation; Power grids; Power system management; Power systems; Power transmission lines; Substations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission & Distribution Conference & Exposition: Asia and Pacific, 2009
  • Conference_Location
    Seoul
  • Print_ISBN
    978-1-4244-5230-9
  • Electronic_ISBN
    978-1-4244-5230-9
  • Type

    conf

  • DOI
    10.1109/TD-ASIA.2009.5356821
  • Filename
    5356821