DocumentCode
2719259
Title
Test and evaluation for power IT apparatus
Author
Rim, Seong-Jeong ; Lee, Yong-Jun ; Lee, Won-Tae
Author_Institution
Korea Electro-Technol. Res. Inst., South Korea
fYear
2009
fDate
26-30 Oct. 2009
Firstpage
1
Lastpage
5
Abstract
This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.
Keywords
IEC standards; conformance testing; smart power grids; substation automation; IEC 61850; conformance tests; interoperability test; power IT apparatus; site acceptance test; smart grid; Communication system control; IEC standards; ISO standards; Manufacturing; Performance evaluation; Power system protection; Quality assurance; Smart grids; Substation protection; System testing; Conformance test; IEC 61850; Interoperability test; Site Acceptance Test;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Conference & Exposition: Asia and Pacific, 2009
Conference_Location
Seoul
Print_ISBN
978-1-4244-5230-9
Electronic_ISBN
978-1-4244-5230-9
Type
conf
DOI
10.1109/TD-ASIA.2009.5356846
Filename
5356846
Link To Document