• DocumentCode
    2719259
  • Title

    Test and evaluation for power IT apparatus

  • Author

    Rim, Seong-Jeong ; Lee, Yong-Jun ; Lee, Won-Tae

  • Author_Institution
    Korea Electro-Technol. Res. Inst., South Korea
  • fYear
    2009
  • fDate
    26-30 Oct. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper discusses the test and evaluation scheme for IEC 61850-based electric power IT equipments. Various IEC 61850-based power IT equipments produced by multi-vendor will consist of the actual test site for smart grid. Site acceptance test (SAT) which carried out the completely installed equipment in the site, gives the confirmation to customer before operation. Conformance tests have to perform in order to achieve the effective SAT. However, devices are passed conformance test, it may still remains the issues during integration, commissioning and operation. To reduce the number of costly issue and problems during integration, site commissioning and operation, therefore, interoperability test is required as well as conformance test.
  • Keywords
    IEC standards; conformance testing; smart power grids; substation automation; IEC 61850; conformance tests; interoperability test; power IT apparatus; site acceptance test; smart grid; Communication system control; IEC standards; ISO standards; Manufacturing; Performance evaluation; Power system protection; Quality assurance; Smart grids; Substation protection; System testing; Conformance test; IEC 61850; Interoperability test; Site Acceptance Test;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission & Distribution Conference & Exposition: Asia and Pacific, 2009
  • Conference_Location
    Seoul
  • Print_ISBN
    978-1-4244-5230-9
  • Electronic_ISBN
    978-1-4244-5230-9
  • Type

    conf

  • DOI
    10.1109/TD-ASIA.2009.5356846
  • Filename
    5356846