Title :
Been there, done that [Detailed Control Room Design Review]
Author :
Cooley, Stephen H.
Author_Institution :
Commonwealth Edison Co., Chicago, IL, USA
Abstract :
The author describes his work in Detailed Control Room Design Reviews with reference to NUREG 0700 guidelines. The work relates to human factors aspects in Commonwealth Edison Company´s nuclear power stations´ control rooms
Keywords :
control facilities; human factors; nuclear power stations; power station control; Commonwealth Edison Company; Detailed Control Room Design Review; NUREG 0700 guidelines; control rooms; human factors; nuclear power stations; Control systems; Educational institutions; Fires; Guidelines; History; Human factors; Licenses; Lighting control; Performance evaluation; Shape;
Conference_Titel :
Human Factors and Power Plants, 1997. Global Perspectives of Human Factors in Power Generation., Proceedings of the 1997 IEEE Sixth Conference on
Conference_Location :
Orlando, FL
Print_ISBN :
0-7803-3769-7
DOI :
10.1109/HFPP.1997.624823