• DocumentCode
    2720117
  • Title

    Were the control room design reviews worth it?

  • Author

    Van Cott, Harold P.

  • Author_Institution
    Van Cott & Assoc., Bethesda, MD, USA
  • fYear
    1997
  • fDate
    8-13 Jun 1997
  • Firstpage
    12114
  • Lastpage
    12479
  • Abstract
    The author discusses his work in human factors aspects of nuclear power station control rooms design. He briefly outlines his work for BioTech on the preparation of the NUREG 0700 guidelines and on a contract with Duke Power Company as well as other experiences
  • Keywords
    control facilities; human factors; nuclear power stations; power station control; Duke Power Company; NUREG 0700 guidelines; control room design reviews; human factors; nuclear power station control rooms; Accidents; Arm; Contracts; Domestic safety; Ergonomics; Guidelines; Home appliances; Human factors; Industrial control; Industrial training;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Human Factors and Power Plants, 1997. Global Perspectives of Human Factors in Power Generation., Proceedings of the 1997 IEEE Sixth Conference on
  • Conference_Location
    Orlando, FL
  • Print_ISBN
    0-7803-3769-7
  • Type

    conf

  • DOI
    10.1109/HFPP.1997.624824
  • Filename
    624824