DocumentCode
2720117
Title
Were the control room design reviews worth it?
Author
Van Cott, Harold P.
Author_Institution
Van Cott & Assoc., Bethesda, MD, USA
fYear
1997
fDate
8-13 Jun 1997
Firstpage
12114
Lastpage
12479
Abstract
The author discusses his work in human factors aspects of nuclear power station control rooms design. He briefly outlines his work for BioTech on the preparation of the NUREG 0700 guidelines and on a contract with Duke Power Company as well as other experiences
Keywords
control facilities; human factors; nuclear power stations; power station control; Duke Power Company; NUREG 0700 guidelines; control room design reviews; human factors; nuclear power station control rooms; Accidents; Arm; Contracts; Domestic safety; Ergonomics; Guidelines; Home appliances; Human factors; Industrial control; Industrial training;
fLanguage
English
Publisher
ieee
Conference_Titel
Human Factors and Power Plants, 1997. Global Perspectives of Human Factors in Power Generation., Proceedings of the 1997 IEEE Sixth Conference on
Conference_Location
Orlando, FL
Print_ISBN
0-7803-3769-7
Type
conf
DOI
10.1109/HFPP.1997.624824
Filename
624824
Link To Document