DocumentCode :
2720543
Title :
Integrated sequence analysis-a solution to HRA problems?
Author :
Andersson, Karl
fYear :
1997
fDate :
8-13 Jun 1997
Firstpage :
42614
Lastpage :
42619
Abstract :
NKS/RAK-I subproject 3 `Integrated Sequence Analysis´ (ISA) forms a part of the four-year nuclear research program (1994-1997) in the Nordic countries. The objectives of ISA are to increase realism and reliability of safety analysis and safety of nuclear installations by creating more integrated ways to perform human reliability analysis (HRA). In this paper, the methodological surveys and application studies of the project are discussed. The authors believe that an integrated analysis by different disciplines is the right way to approach HRA problems
Keywords :
human factors; nuclear power stations; power station control; power system reliability; project engineering; NKS/RAK-I subproject 3; Nordic countries; human reliability analysis; integrated sequence analysis; nuclear power plant control; research program; safety analysis; Automation; Electronic mail; Electronic switching systems; Human factors; Instruction sets; Man machine systems; Performance analysis; Performance evaluation; Power generation; Safety;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Human Factors and Power Plants, 1997. Global Perspectives of Human Factors in Power Generation., Proceedings of the 1997 IEEE Sixth Conference on
Conference_Location :
Orlando, FL
Print_ISBN :
0-7803-3769-7
Type :
conf
DOI :
10.1109/HFPP.1997.624857
Filename :
624857
Link To Document :
بازگشت