TPX assembly plan
Author
Knutson, Donald
Author_Institution
Plasma Phys. Lab., Princeton Univ., NJ, USA
Volume
2
fYear
1993
fDate
11-15 Oct 1993
Firstpage
703
Abstract
The TPX machine will be assembled in the TFTR Test Cell at the Plasma Physics Laboratory, utilizing the existing TFTR machine foundation. Preparation of the area for assembly will begin after completion of the decontamination and decommissioning phase on TFTR and certification that the radiation levels remaining, if any, are consistent with the types of operations planned. Assembly operations begin with the arrival of the first components, and conclude, approximately 24 months later, with the successful completion of the integrated systems tests and the achievement of a first plasma
Keywords
fusion reactor design; fusion reactors; TFTR Test Cell; TPX assembly plan; decommissioning; decontamination; integrated systems tests; radiation levels; Assembly; Boring; Fixtures; Laboratories; Machining; Physics; Plasmas; Secure storage; System testing; Welding;
fLanguage
English
Publisher
ieee
Conference_Titel
Fusion Engineering, 1993., 15th IEEE/NPSS Symposium on
Conference_Location
Hyannis, MA
Print_ISBN
0-7803-1412-3
Type
conf
DOI
10.1109/FUSION.1993.518425
Filename
518425
Link To Document