  • Abstract
    The TPX machine will be assembled in the TFTR Test Cell at the Plasma Physics Laboratory, utilizing the existing TFTR machine foundation. Preparation of the area for assembly will begin after completion of the decontamination and decommissioning phase on TFTR and certification that the radiation levels remaining, if any, are consistent with the types of operations planned. Assembly operations begin with the arrival of the first components, and conclude, approximately 24 months later, with the successful completion of the integrated systems tests and the achievement of a first plasma
  • Keywords
    fusion reactor design; fusion reactors; TFTR Test Cell; TPX assembly plan; decommissioning; decontamination; integrated systems tests; radiation levels; Assembly; Boring; Fixtures; Laboratories; Machining; Physics; Plasmas; Secure storage; System testing; Welding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fusion Engineering, 1993., 15th IEEE/NPSS Symposium on
  • Conference_Location
    Hyannis, MA
  • Print_ISBN
    0-7803-1412-3
  • Type

    conf

  • DOI
    10.1109/FUSION.1993.518425
  • Filename
    518425