Title :
Power quality study-1990 to 1995
Author :
Jurewicz, Robert E.
Author_Institution :
Nat. Power Lab., Necedah, WI, USA
Abstract :
The development, scope and objectives of the five-year power quality study being conducted by the National Power Laboratory is described. This five-year study of power line disturbances will monitor a 120 volt AC electrical service at the point of utilization. The study will use 50 special Dranetz remote disturbance monitors at 235 sites in ten geographic regions of the United States and Canada. The total database of the study will be approximately 1800 monitor months. Special aspects of this study include the ability to capture sub-cycle events and graphically reproduce all recorded power disturbances. Program elements discussed include the selection process for the monitor equipment, study participants, and test of sites. Also, an examination of the data collection system, threshold settings, and database capabilities is included.<>
Keywords :
power supply quality; telemetering; AC electrical service; Canada; Dranetz remote disturbance monitors; National Power Laboratory; United States; data collection system; database capabilities; power line disturbances; power quality study; threshold settings; Computerized monitoring; Costs; Electrical products industry; Laboratories; Manufacturing; Power quality; Remote monitoring; Switches; Testing; Uninterruptible power systems;
Conference_Titel :
Telecommunications Energy Conference, 1990. INTELEC '90., 12th International
Conference_Location :
Orlando, FL, USA
DOI :
10.1109/INTLEC.1990.171284