• DocumentCode
    2729949
  • Title

    Integrated design and manufacture: a pilot project approach to implementation

  • Author

    Brown, T.T.

  • Author_Institution
    Lucas Eng. & Syst. Ltd., Solihull, UK
  • fYear
    1995
  • fDate
    34858
  • Firstpage
    42644
  • Lastpage
    42648
  • Abstract
    New product development best practice models advocate the integration of teamwork, simultaneous engineering, tools and techniques, a front loaded process and project management. The design of the model is relatively straightforward compared with implementation which is significantly more difficult. An approach that has lead to some implementation success is the pilot project approach where a carefully selected product development project is used as a vehicle for good practice demonstration and learning. The project is planned to incorporate all the key elements listed above and is undertaken as though best practice methods are fully implemented within the organisation. The paper describes alternative implementation scenarios when using this approach, the Lucas Integrated Design and Manufacture model and some of the implementation pitfalls
  • Keywords
    manufacture; product development; project management; Lucas Integrated Design and Manufacture model; front loaded process; integrated design; integrated manufacture; pilot project approach; product development; product development best practice models; project management; simultaneous engineering; teamwork;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Concurrent Engineering - Getting it Right First Time, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19950822
  • Filename
    478312