DocumentCode :
2732075
Title :
Estimation of Time and Cost Oriented Assembly Line Balancing Problem
Author :
Grzechca, Waldemar
Author_Institution :
Silesian Univ. of Technol., Gliwice
fYear :
2008
fDate :
19-21 Aug. 2008
Firstpage :
248
Lastpage :
253
Abstract :
This paper deals with the time and cost oriented balancing of a single assembly line where a vast quantity of one single product has to be assembled. The cost-oriented assembly line balancing problem is a generalization of the time-oriented assembly line balancing problem. The objective in cost-oriented assembly line balancing consists in minimizing the total costs per unit. Author of this paper proposes to solve the problem in two ways. First, for a time-oriented problem it will be used some of heuristic methods (RPW, IUFF, Kilbridge&Wester, Moodie&Young) and next for cost-oriented problem it will be used some other heuristic methods given in literature. We should very often consider different measurements of balance ( time of line, smoothness index, line efficiency) to find the best given solution for the calculated problem. As a conclusion author proposes a new measurement method which connects results for time and cost-oriented balance methods.
Keywords :
assembling; costing; resource allocation; time management; assembly line balancing problem; cost oriented balancing; time oriented balancing; Assembly systems; Costs; Feeds; Manufacturing; Materials handling; Production; Robotic assembly; Systems engineering and theory; Time measurement; Workstations; assembly line; efficiency; heuristic methods;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems Engineering, 2008. ICSENG '08. 19th International Conference on
Conference_Location :
Las Vegas, NV
Print_ISBN :
978-0-7695-3331-5
Type :
conf
DOI :
10.1109/ICSEng.2008.48
Filename :
4616645
Link To Document :
بازگشت