DocumentCode
273367
Title
Planning of plant refurbishment
Author
Wade, J.A. ; Longman, A.D.
fYear
1988
fDate
7-8 Nov 1988
Firstpage
9
Lastpage
15
Abstract
The authors describe four very different types of plant refurbishment planning-three hydro stations which can be classified as mini, small and conventional and one thermal station. The circumstances leading to refurbishment are quite different for each project described, but having made the decision, the route to implementation should be reasonably conventional. The most important ingredient in planning is defining the scope of work. On site inspection and testing is essential as review of operation and maintenance logs and discussions with power house staff can give leads as to what needs to be done. Investment at this stage-including the loss of generation while machines are being inspected-will remove many delays and financial shocks during implementation.
Keywords
hydroelectric power stations; inspection; maintenance engineering; testing; thermal power stations; hydroelectric power stations; inspection; maintenance; power station refurbishment planning; testing; thermal power stations;
fLanguage
English
Publisher
iet
Conference_Titel
Refurbishment of Power Station Electrical Plant, 1988. International Conference on
Conference_Location
IET
Print_ISBN
0-85296-371-8
Type
conf
Filename
20558
Link To Document