DocumentCode
273392
Title
Refurbishment of turbine generators
Author
Cross, C.S. ; Petty, D.J.
Author_Institution
NEI Parsons Ltd., Newcastle-upon-tyne, UK
fYear
1988
fDate
7-8 Nov 1988
Firstpage
155
Lastpage
159
Abstract
There are two possible strategies which can be applied to the refurbishment of turbine generators: the unit is operated until there is a breakdown or a serious fault is discovered during maintenance, the repair/corrective modification is then applied to all similar units during subsequent planned outages; or, the generator is completely refurbished for a specified extended design life with accompanying technical and commercial assurances. Recently, generating utilities have embarked on the second strategy and the main part of the authors´ work concentrates on the scope of work necessary for complete refurbishment. An outline is given of the inspection and analytical methods used in the revalidation of the stator fabrications and rotor forging. The replacement of materials with modern alternatives is discussed and design changes to improve the reliability and flexibility of the unit are also considered
Keywords
electric generators; maintenance engineering; rotors; stators; turbines; inspection; refurbishment; reliability; rotor forging; stator fabrications; turbine generators;
fLanguage
English
Publisher
iet
Conference_Titel
Refurbishment of Power Station Electrical Plant, 1988. International Conference on
Conference_Location
London
Print_ISBN
0-85296-371-8
Type
conf
Filename
20586
Link To Document