Examples of hydro generator refurbishment in Ontario Hydro and the CEGB
Author :
Lyles, J.F. ; Smith, J.W.R.
Author_Institution :
Ontario Hydro, Toronto, Ont., Canada
fYear :
1988
fDate :
7-8 Nov 1988
Firstpage :
176
Lastpage :
180
Abstract :
The authors consider the options available when refurbishment of hydro plant is required. Two examples of refurbishment of hydro generator plant are described which cover two different approaches for plant refurbishment. These are the partial or complete re-planting. An example of complete re-planting of a 51.5 MW hydro generator by Ontario Hydro is described, and the partial refurbishment of a 90 MW pump storage generator-motor by the CEGB considered
Keywords :
hydroelectric generators; maintenance engineering; pumped-storage power stations; 51.5 MW; 90 MW; CEGB; Ontario Hydro; complete re-planting; hydro generator refurbishment; partial re-planting; pump storage generator-motor;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Refurbishment of Power Station Electrical Plant, 1988. International Conference on
Conference_Location :
London
Print_ISBN :
0-85296-371-8
Type :
conf
Filename :
20590
Link To Document :
بازگشت