DocumentCode :
273423
Title :
Load shedding scheme of the Jordanian national power system
Author :
Abusharkh, M.F. ; Hiyasat, A.A.
fYear :
1989
fDate :
11-13 Apr 1989
Firstpage :
96
Lastpage :
101
Abstract :
Since 1977, underfrequency relays have been used in the Jordan Electricity Authority (JEA) power system to disconnect a predetermined portion of load when the frequency falls due to loss of generation. More recently rate-of-change frequency sensitive relays and undervoltage relays have been used to complete the load shedding scheme. The authors describe this load shedding scheme which aims at preventing a cascade trip of the system generating units and avoid a total system collapse
fLanguage :
English
Publisher :
iet
Conference_Titel :
Developments in Power Protection, 1989., Fourth International Conference on
Conference_Location :
Edinburgh
Type :
conf
Filename :
20620
Link To Document :
بازگشت