• DocumentCode
    2739205
  • Title

    Extending Hadoop´s Yarn Scheduler Load Simulator with a highly realistic network & traffic model

  • Author

    Wette, Philip ; Schwabe, Arne ; Splietker, Malte ; Karl, Holger

  • Author_Institution
    Univ. of Paderborn, Paderborn, Germany
  • fYear
    2015
  • fDate
    13-17 April 2015
  • Firstpage
    1
  • Lastpage
    2
  • Abstract
    Research on accelerating big-data applications can be divided into job scheduling and flow scheduling. Job scheduling focuses on the timely and spacial placement of jobs on execution units. Flow scheduling, on the other hand, concentrates on routing of flows originating from actively running jobs. Although both job scheduling and flow scheduling work on accelerating big-data applications, their view on the problem and the available information is very different. We propose a new simulation tool to evaluate ideas that jointly solve the job and flow scheduling problem for big-data applications. Our tool combines the Yarn Scheduler Load Simulator with the distributed network emulator MaxiNet. With our work, the interdependency between the network and the jobs running on top of it can be included into the evaluation of new ideas, leveraging research on big-data applications with joint job and flow scheduling.
  • Keywords
    Big Data; flow shop scheduling; job shop scheduling; parallel processing; telecommunication traffic; Big Data applications; Hadoop; MaxiNet; flow scheduling; job scheduling; load simulator; realistic network; traffic model; yarn scheduler; Data communication; Load modeling; Network topology; Nickel; Scheduling algorithms; Topology; Yarn;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Network Softwarization (NetSoft), 2015 1st IEEE Conference on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1109/NETSOFT.2015.7116169
  • Filename
    7116169