• DocumentCode
    2739462
  • Title

    Application of Analytic Hierarchy Process in Power Lines Maintenance

  • Author

    Lin, Zhiling ; Gao, Liqun ; Zhang, Dapeng ; Ren, Ping ; Li, Yang

  • Author_Institution
    Coll. of Inf. Sci. & Eng., Northeast Univ., Shenyang
  • Volume
    2
  • fYear
    0
  • fDate
    0-0 0
  • Firstpage
    7596
  • Lastpage
    7599
  • Abstract
    The lines maintenance plan has always been drawn only by experiences and trials due to this work´s difficult. There exist many disadvantages. In this paper analytic hierarchy process (AHP), an effective method that can solve a multiple criteria and multiple objective decision-making problems was introduced to the power lines maintenance problem in order to gain a scientific and objective maintenance scheduling. Firstly an AHP model was built up on the base of analyzing correlative factors. Then an example was given to indicate how AHP to apply
  • Keywords
    maintenance engineering; power cables; power system management; analytic hierarchy process; multiple criteria decision making problems; multiple objective decision making problems; power lines maintenance; Costs; Decision making; Dispatching; Energy management; Power generation; Power system modeling; Power system reliability; Power system security; Power transmission lines; Scheduling; Analytic hierarchy process; Hierarchical structure model; Power lines maintenance; Sequencing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
  • Conference_Location
    Dalian
  • Print_ISBN
    1-4244-0332-4
  • Type

    conf

  • DOI
    10.1109/WCICA.2006.1713443
  • Filename
    1713443