• DocumentCode
    2739917
  • Title

    State of the Art of 1 MW/105-140 GHz/10 Sec Gyrotron Project in GYCOM

  • Author

    Nichiporenko, V.O. ; Agapova, M.V. ; Denisov, G.G. ; Ilyin, V.I. ; Litvak, A.G. ; Malygin, S.A. ; Myasnikov, V.E. ; Popov, L.G. ; Solujanova, E.A. ; Zapevalov, V.E. ; Tai, E.M.

  • Author_Institution
    GYCOM Ltd., Nizhny Novgorod
  • fYear
    2006
  • fDate
    18-22 Sept. 2006
  • Firstpage
    338
  • Lastpage
    338
  • Abstract
    In a frame of Russian-German scientific cooperation GYCOM Ltd. and IAP develop 1-MW power level dual/multi-frequency gyrotrons. Two long pulse industrial tubes have been built up to now. First gyrotron is installed in IPP, Garching, Germany in July, 2005. Second tube with similar design and parameters was successfully tested and is prepared for shipping to IPP. Problem of output window creation for multifrequency megawatt level continuous wave (CW) gyrotron is in solving now.
  • Keywords
    gyrotrons; millimetre wave devices; Garching; Germany; IAP; IPP; Russian-German scientific cooperation; GYCOM Ltd; frequency 105 GHz to 140 GHz; multifrequency megawatt level continuous wave gyrotron; output window creation; power 1 MW; time 10 s; Frequency measurement; Fusion reactors; Gyrotrons; Heating; Manufacturing; Plasma sources; Power generation; Radio frequency; Temperature control; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Infrared Millimeter Waves and 14th International Conference on Teraherz Electronics, 2006. IRMMW-THz 2006. Joint 31st International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    1-4244-0400-2
  • Electronic_ISBN
    1-4244-0400-2
  • Type

    conf

  • DOI
    10.1109/ICIMW.2006.368546
  • Filename
    4222280