    The design, construction and operation of the overheat fixed equipment for the Queensland Railways main line electrification project

  • Author

    Nugent, P.

  • fYear
    1989
  • fDate
    25-28 Set 1989
  • Firstpage
    109
  • Lastpage
    113
  • Abstract
    Over the last ten years Queensland Railways have experienced a massive expansion in the amount of overhead equipment installed and by mid 1989 will have approximately 2467 single track kilometres of 25 kV overhead catenary. It is important the QR should now concentrate on the most economical way of maintaining the catenary system. One such method which should reduce maintenance costs is a Track and Overhead Inspection and Recording car which is due for delivery later this year. Experience to date has shown that the catenary system installed should accommodate the traffic requirement of Queensland Railways for many years to come with a minimum of maintenance
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Main Line Railway Electrification, 1989., International Conference on
  • Conference_Location
    York
  • Type

    conf

  • Filename
    51853