DocumentCode :
274064
Title :
3 kV DC catenary upgrade to 200 km/h for Spanish Railways
Author :
Doughty, J. ; Thorman, G.
Author_Institution :
Balfour Beatty Power Ltd., Thornton Heath, UK
fYear :
1989
fDate :
25-28 Set 1989
Firstpage :
114
Lastpage :
118
Abstract :
The authors highlight the main course of events leading up to the uprating of the Spanish State Railways (RENFE) 3 kV DC lines to run at 200 km/h. Three test sections of the railway are identified to test different contractors´ solutions. The authors concentrate on the Balfour Beatty/Nemel solution, which has been installed in the Test Section Number 2, Villar de Chinchilla to Almansa Station. The steps taken to achieve an optimised design are demonstrated. The design process started with the existing equipment format and showed how, by using the most up to date computer techniques, it was possible to establish the overall sensitivity of key aspects of the design. These aspects, wherever practicable, are developed to fit into the existing equipment with a minimum of change
Keywords :
distribution networks; power overhead lines; railways; 3 kV; Almansa Station; Balfour Beatty/Nemel; DC catenary upgrade; RENFE; Spanish State Railways; Test Section Number 2; Villar de Chinchilla;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Main Line Railway Electrification, 1989., International Conference on
Conference_Location :
York
Type :
conf
Filename :
51854
Link To Document :
بازگشت