• DocumentCode
    274099
  • Title

    New generation signalling control centre

  • Author

    Beady, F.F. ; Bartlett, P.J.N.

  • fYear
    1989
  • fDate
    25-28 Set 1989
  • Firstpage
    317
  • Lastpage
    321
  • Abstract
    Easter weekend 1989 saw the commissioning of British Rail´s first Integrated Electronic Control Centre (IECC). This event marked a major change in signalling technology where mimic diagrams were replaced by colour monitors and train routesetting and regulation is now an automatic function with manual intervention if required. Liverpool Street was the first of the new generation signalling control centres to be brought into service and was closely followed by the first stage of the new control centre at York
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Main Line Railway Electrification, 1989., International Conference on
  • Conference_Location
    York
  • Type

    conf

  • Filename
    51894