New generation signalling control centre
Author
Beady, F.F. ; Bartlett, P.J.N.
fYear
1989
fDate
25-28 Set 1989
Firstpage
317
Lastpage
321
Abstract
Easter weekend 1989 saw the commissioning of British Rail´s first Integrated Electronic Control Centre (IECC). This event marked a major change in signalling technology where mimic diagrams were replaced by colour monitors and train routesetting and regulation is now an automatic function with manual intervention if required. Liverpool Street was the first of the new generation signalling control centres to be brought into service and was closely followed by the first stage of the new control centre at York