DocumentCode :
274115
Title :
Channel Tunnel Shuttle locomotives, an overview of the design process
Author :
May, C.C. ; Phillips, C.R.G.
fYear :
1989
fDate :
25-28 Set 1989
Firstpage :
408
Lastpage :
412
Abstract :
The authors discuss the factors affecting design and selection of the locomotives for the Channel Tunnel. The main factors considered are the tunnel infrastructure and the operating performance requirements. The authors concentrate on the installed power, mechanical parts and reliability
fLanguage :
English
Publisher :
iet
Conference_Titel :
Main Line Railway Electrification, 1989., International Conference on
Conference_Location :
York
Type :
conf
Filename :
51912
Link To Document :
بازگشت