DocumentCode
2745646
Title
One-machine scheduling for minimizing total flow time with release dates
Author
Chu, Chengbin
Author_Institution
Cescom, Metz, France
fYear
1990
fDate
21-23 May 1990
Firstpage
570
Lastpage
576
Abstract
The one-machine scheduling problem of minimizing total flow time with different release dates is addressed. This problem is equivalent to the problems of minimizing total completion time, total job lateness, and mean number of jobs in the shop, and it is NP-hard. A necessary and sufficient condition is proved for local optimality and can be considered as a priority rule. Based on this condition, a subset containing all the optimal schedules is defined. Any schedule in this subset verifies some dominance properties proved by other researchers. The author also proposes some efficient heuristic algorithms using the proven condition to build a schedule belonging to this subset. The algorithm performances are provided
Keywords
minimisation; production control; scheduling; NP-hard; heuristic algorithms; job shop; minimisation; one-machine scheduling; production control; release dates; total completion time; total flow time; total job lateness; Clustering algorithms; Heuristic algorithms; Job shop scheduling; Optimal scheduling; Partitioning algorithms; Polynomials; Relaxation methods; Scheduling algorithm; Single machine scheduling; Sufficient conditions;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Integrated Manufacturing, 1990., Proceedings of Rensselaer's Second International Conference on
Conference_Location
Troy, NY
Print_ISBN
0-8186-1966-X
Type
conf
DOI
10.1109/CIM.1990.128164
Filename
128164
Link To Document