• DocumentCode
    2745646
  • Title

    One-machine scheduling for minimizing total flow time with release dates

  • Author

    Chu, Chengbin

  • Author_Institution
    Cescom, Metz, France
  • fYear
    1990
  • fDate
    21-23 May 1990
  • Firstpage
    570
  • Lastpage
    576
  • Abstract
    The one-machine scheduling problem of minimizing total flow time with different release dates is addressed. This problem is equivalent to the problems of minimizing total completion time, total job lateness, and mean number of jobs in the shop, and it is NP-hard. A necessary and sufficient condition is proved for local optimality and can be considered as a priority rule. Based on this condition, a subset containing all the optimal schedules is defined. Any schedule in this subset verifies some dominance properties proved by other researchers. The author also proposes some efficient heuristic algorithms using the proven condition to build a schedule belonging to this subset. The algorithm performances are provided
  • Keywords
    minimisation; production control; scheduling; NP-hard; heuristic algorithms; job shop; minimisation; one-machine scheduling; production control; release dates; total completion time; total flow time; total job lateness; Clustering algorithms; Heuristic algorithms; Job shop scheduling; Optimal scheduling; Partitioning algorithms; Polynomials; Relaxation methods; Scheduling algorithm; Single machine scheduling; Sufficient conditions;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Integrated Manufacturing, 1990., Proceedings of Rensselaer's Second International Conference on
  • Conference_Location
    Troy, NY
  • Print_ISBN
    0-8186-1966-X
  • Type

    conf

  • DOI
    10.1109/CIM.1990.128164
  • Filename
    128164