DocumentCode :
2746381
Title :
Construction of immersed tunnel in Osaka Port
Author :
Shishido, Tatsuyuki ; Mikami, Keiichi ; Adachi, Shigeaki ; Yuasa, Kazufumi
Author_Institution :
Kobe Investigation and Design Office, The Third District Port Construction Bureau, Ministry of Transport
fYear :
1998
fDate :
15-17 Apr 1998
Firstpage :
329
Lastpage :
333
Abstract :
The Sakishima Tunnel constructed under a main fairway in Osaka Port is the first combined roadway and railway immersed tunnel in Japan. This project required the solution of various engineering problems posed by the severe conditions for design and construction. In designing the tunnel, many engineering reviews including model experiments were carried out to overcome the problems by utilizing tunnel elements with steel-concrete composite structure, V-block construction for a terminal joint, floating caisson construction, and other methods. Construction was performed by tunnel element manufacturing, construction control for settlement and navigational safety control, etc. The ventilation system utilizes fuzzy logic to ensure a comfortable and safe undersea tunnel environment
Keywords :
civil engineering; fuzzy control; navigation; safety; ventilation; Japan; Osaka Port; V-block construction; floating caisson; fuzzy control; immersed tunnel; navigation; safety; steel-concrete composite structure; terminal joint; ventilation; Cities and towns; Joining processes; Navigation; Poles and towers; Rail transportation; Railway engineering; Safety; Shafts; Steel; Ventilation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Underwater Technology, 1998. Proceedings of the 1998 International Symposium on
Conference_Location :
Tokyo
Print_ISBN :
0-7803-4273-9
Type :
conf
DOI :
10.1109/UT.1998.670118
Filename :
670118
Link To Document :
بازگشت