DocumentCode
275132
Title
The replacement of recording facilities at television centre
Author
Frisby, J.A. ; Ferne, A.C.
Author_Institution
BBC, London, UK
fYear
1990
fDate
21-25 Sep 1990
Firstpage
282
Lastpage
286
Abstract
The authors look at the new post production facilities at the BBC Television Centre and its routeing system design needed for operational facilities, incorporating about 180 VTRs and telecines in total. The routeing system provides a high level of security and matrix control. They also describe the aspects of system tuning, choice of VTRs and the various technical levels within the post production areas
Keywords
remote consoles; television equipment; television studios; BBC Television Centre; TV studio control panel; VTR; matrix control; post production facilities; recording facilities; routeing system design; system tuning; technical levels; telecines;
fLanguage
English
Publisher
iet
Conference_Titel
Broadcasting Convention, 1990. IBC 1990., International
Conference_Location
Brighton
Type
conf
Filename
114474
Link To Document