Title :
Using Enhancement Method to Improve Earned Value Index to Achieve an Accurate Project Time and Cost Estimation
Author :
Attarzadeh, Iman ; Hock, Ow Siew
Author_Institution :
Dept. of Software Eng., Univ. of Malaya, Kuala Lumpur, Malaysia
Abstract :
This paper presents how to use enhancement method to improve Earned Value (EV) method of projects. This method improves earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 - Visual Basic .NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.
Keywords :
PERT; costing; project management; value engineering; Visual Studio 2008; cost estimation; cost performance index; cost variance; earned value management system; earned value method; forecasting time; schedule variance; scheduled performance index; Computer science; Costs; Economic forecasting; Equations; Information technology; Performance analysis; Project management; Shape measurement; Software engineering; Visual BASIC; Cost Performance Index; Earned Value; Performance Management; Schedule Performance Index; Time and Cost forecasting;
Conference_Titel :
Future Computer and Communication, 2009. ICFCC 2009. International Conference on
Conference_Location :
Kuala Lumpar
Print_ISBN :
978-0-7695-3591-3
DOI :
10.1109/ICFCC.2009.68