Challenges and methodologies in transmission planning for mega-cities
Author :
Oprea, L. ; Popescu, V.
Author_Institution :
Fichtner GmbH&Co KG, Stuttgart
fYear :
2008
fDate :
5-7 May 2008
Firstpage :
726
Lastpage :
731
Abstract :
This paper presents novel aspects of transmission planning for mega-citiespsila power systems. Due to their huge concentration of loads, conventional planning methodologies invariably exhaust the technological limits of commercially-available equipment when faced with challenges like single-phase and three-phase fault short circuits, scarcity of transmission corridors and difficulties of accommodating non-conventional technologies based on power electronics, like HVDC links or short circuit current limiters, in particular due to their large footprints. Finally, this paper summarizes recommended criteria for strategic planning and notes that non-conventional solutions for reducing fault levels are unavoidable in the context of the extraordinary load growth rates of some developing mega-citiespsila power systems.
Keywords :
power transmission faults; power transmission planning; strategic planning; HVDC links; mega-cities power systems; power electronics; short circuit current limiters; single-phase fault short circuits; strategic planning; three-phase fault short circuits; transmission planning; Circuit faults; Power generation; Power generation planning; Power system faults; Power system planning; Power system reliability; Power system security; Switchgear; Technology planning; Voltage; planning criteria; power system security; transmission lines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrotechnical Conference, 2008. MELECON 2008. The 14th IEEE Mediterranean
Conference_Location :
Ajaccio
Print_ISBN :
978-1-4244-1632-5
Electronic_ISBN :
978-1-4244-1633-2
Type :
conf
DOI :
10.1109/MELCON.2008.4618521
Filename :
4618521
Link To Document :
بازگشت