DocumentCode
2759660
Title
Elevator Group Control Scheduling Approach Based on Multi-Agent Coordination*
Author
Zong, Qun ; Dou, Liqian ; Wang, Weijia
Author_Institution
Coll. of Electr. & Autom. Eng., Tianjin City Univ.
Volume
2
fYear
0
fDate
0-0 0
Firstpage
7249
Lastpage
7253
Abstract
Elevator group control scheduling problem is considered using the approach of multi-agent coordination. Unlike traditional elevator group control scheduling approaches that were implemented by a central agent, this scheduling proposed in this paper was implemented by many elevator agents, and every agent is able to calculate, reason and decide. Based on this, the structure of single elevator agent and the structure of system are designed, and coordination mechanism is then defined. Finally, in computer, the algorithm is simulated and compared with other scheduling algorithms. The results show the approach proposed in the paper can reduce effectively the average waiting time of passengers and rate of waiting long time of passengers, and it indicates an excellent applicability at most of traffic flow pattern
Keywords
control engineering computing; intelligent control; lifts; multi-agent systems; scheduling; agent coordination mechanism; elevator group control scheduling; multiagent coordination; single elevator agent; traffic flow pattern; Artificial intelligence; Automatic control; Computational modeling; Computer simulation; Control systems; Educational institutions; Elevators; Learning; Processor scheduling; Scheduling algorithm; Agent coordination; Elevator group control; Elevator schedule; Multiagent;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
Conference_Location
Dalian
Print_ISBN
1-4244-0332-4
Type
conf
DOI
10.1109/WCICA.2006.1714493
Filename
1714493
Link To Document